TAMALIKA, TOLU (2025) ANALISIS PENGARUH PENJADWALAN DAN PENGENDALIAN PROYEK DENGAN METODE PDM, PERT, TCTO, DAN EARNED VALUE TERHADAP APLIKASINYA PADA PROYEK KONSTRUKSI DI KOTA PALEMBANG. Other thesis, UNIVERSITAS BINA DARMA.
|
Text (BAB 0)
0.pdf Download (3MB) |
|
|
Text (BAB 1)
1.pdf Download (1MB) |
|
|
Text (DAFTAR PUSTAKA)
D.pdf Download (925kB) |
|
|
Text (FULLBAB SKRIPSI)
F.pdf Restricted to Repository staff only Download (3MB) |
|
|
Text (LAMPIRAN)
L.pdf Download (2MB) |
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | Manajemen Konstruksi, Metode PDM, PERT, TCTO, EVM, SEM PLS, Efektivitas Proyek. |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment |
| Depositing User: | Miss Marina Ina |
| Date Deposited: | 26 Jun 2026 07:27 |
| Last Modified: | 26 Jun 2026 07:27 |
| URI: | http://repository.binadarma.ac.id/id/eprint/9734 |
Actions (login required)
![]() |
View Item |
