ANALISIS PENGARUH PENJADWALAN DAN PENGENDALIAN PROYEK DENGAN METODE PDM, PERT, TCTO, DAN EARNED VALUE TERHADAP APLIKASINYA PADA PROYEK KONSTRUKSI DI KOTA PALEMBANG

TAMALIKA, TOLU (2025) ANALISIS PENGARUH PENJADWALAN DAN PENGENDALIAN PROYEK DENGAN METODE PDM, PERT, TCTO, DAN EARNED VALUE TERHADAP APLIKASINYA PADA PROYEK KONSTRUKSI DI KOTA PALEMBANG. Other thesis, UNIVERSITAS BINA DARMA.

[img] Text (BAB 0)
0.pdf

Download (3MB)
[img] Text (BAB 1)
1.pdf

Download (1MB)
[img] Text (DAFTAR PUSTAKA)
D.pdf

Download (925kB)
[img] Text (FULLBAB SKRIPSI)
F.pdf
Restricted to Repository staff only

Download (3MB)
[img] Text (LAMPIRAN)
L.pdf

Download (2MB)
Item Type: Thesis (Other)
Uncontrolled Keywords: Manajemen Konstruksi, Metode PDM, PERT, TCTO, EVM, SEM PLS, Efektivitas Proyek.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment
Depositing User: Miss Marina Ina
Date Deposited: 26 Jun 2026 07:27
Last Modified: 26 Jun 2026 07:27
URI: http://repository.binadarma.ac.id/id/eprint/9734

Actions (login required)

View Item View Item